MEPCO Net Metering 2026: Policy, Rates, Cost and Online Application

If you want to make you electricity consumption more efficient to reduce your electricity bills, MEPCO net metering is the best way for you.

MEPCO net metering allows the electricity consumers to generate their own electricity so that the consumers can reduce their ekectricity units consumption, and reduce their monthly bills.

What Is MEPCO Net Metering?

MEPCO Net Metering

MEPCO Net Metering is a system in which a MEPCO consumer installes solar panel system to its premises. This solar system generates electricity which is used by the consumer.

The extra electricity units that are generated by the solar system is exported to the MEPCO. And if solar system generates less electricity units than the required, the units are imported from MEPCO.

At the end of each billing cycle, MEPCO adjusts exported units against imported units. If you consume more than you export, you pay only for the net units. If you export more than you consume, the extra units are carried forward as credit.

Important Note: It’s important to understand that net metering does not mean MEPCO pays you the same rate it charges for electricity. The adjustment is done under NEPRA-approved rates, which MEPCO follows strictly.

What Is MEPCO Green Meter?

To measure this export and import of electricity units, MEPCO installs a bi-directional meter in the premises of the consumer. This bi-directional meter is called MEPCO Green Meter. It calculates:

  • Electricity imported from the grid
  • Electricity exported back to the grid

History of Net Metering in Pakistan & MEPCO’s Role

MEPCO Net Metering History

The concept of MEPCO net metering is not new. It was first introduced in 2015 by NEPRA (National Electric Power Regulatory Authority) under the Alternative & Renewable Energy Distributed Generation and Net Metering Regulations.

These rules allowed the MEPCO users to generate their own electricity, and transfer surplus electricity units to the MEPCO grid in exchange for credits.

This idea of MEPCO net metering was introduced to encourage renewable energy generation so that the pressure on the MEPCO national grid can be reduced. Today in 2026, this net metering system is wildly adopted by the people.

Allowed Technical Standards and Safety Requirements for MEPCO Net Metering

Following are the technical standards and safety requirements that you need to fullfil so that you can get the net metering connection approval:

Solar Panel Standards

  • IEC 61215 (Design and performance standard)
  • IEC 61730 (Safety qualification standard)
  • IEC 61646 (Thin-film solar module standard)
  • EN or equivalent international standards

Inverter Standards

  • UL 1741 (Grid-connected inverter safety standard)
  • IEEE 1547 (Grid interconnection standard)
  • IEC 62109-1 (Inverter safety standard)
  • IEC 62109-2 (Additional inverter safety standard)
  • IEC 61000-6 (Electromagnetic compatibility standard)

Meter Standards

  • IEC 62053 (Meter accuracy standard)
  • Bidirectional (import/export) energy meter required
  • Tamper-proof meter

Electrical System Standards

  • Voltage compatibility with MEPCO grid
  • Maximum generation capacity up to 1.5× sanctioned load
  • Proper system wiring according to electrical standards
  • Approved system design and single-line diagram

Protection Requirements

  • Anti-islanding protection in inverter
  • Circuit breakers installed
  • Protective relays installed
  • Over-voltage protection
  • Under-voltage protection
  • Over-frequency protection
  • Under-frequency protection

Grounding and Earthing

  • Proper earthing system installed
  • Separate earthing for inverter and structure
  • Earth resistance within allowed limits

Isolation and Disconnect Requirements

  • Manual disconnect switch installed
  • Emergency isolation switch available
  • Accessible disconnection point for MEPCO

Surge and Lightning Protection

  • Surge Protection Devices (SPD) installed
  • Lightning protection system installed
  • Proper grounding for surge protection

Structural and Installation Safety

  • Proper mounting structure installed
  • Structure resistant to wind and weather
  • Secure installation of panels and equipment

Inspection and Approval Requirements

  • Electrical Inspector approval required
  • MEPCO inspection required
  • Safety clearance certificate required
  • Equipment certification documents required

Documentation Requirements

  • Single Line Diagram (SLD)
  • Inverter specifications
  • Solar panel specifications
  • System design documents
  • Installation completion certificate

Eligibility Criteria for MEPCO Net Metering

The MEPCO net metering eligibility criteria is:

  • You must have an active MEPCO electricity connection.
  • You must have installed a solar system.
  • You must have a three-phase electricity connection.
  • You have the required solar system size.
    • Minimum system size: 1 kW
    • Maximum system size: Up to 1 MW (1000 kW)
    • The solar system size must not exceed 1.5 times your sanctioned load.
  • Your approved electricity load must be equal to or greater than your solar system capacity. This ensures safe connection with the electricity grid.
  • You must clear all MEPCO electricity dues.
  • Your solar system must be installed by an AEDB-approved installer.
  • You must own the property or have permission.
  • You must sign a net metering agreement with MEPCO and get approval from NEPRA. This allows you to export extra electricity to the grid.

How to apply for MEPCO Net Metering (Step-by-step Guide)

To get instant approval for MEPCO net metering, follow the given step-by-step guide:

Step 1: Install an On-Grid Solar System

First of all you need to install an on-grid solar system at your home or business. Make sure:

  • The system is installed by a qualified installer
  • The inverter and solar panels meet required standards
  • The system size is within your sanctioned load limit

Step 2: Prepare Required Documents

To increase your chances of approval, you must submit the required documents. MEPCO requires the following documents for net metering connection:

  • Copy of CNIC
  • Copy of recent MEPCO electricity bill
  • Solar system invoice
  • Solar panel and inverter specifications
  • Single Line Diagram (SLD) of the solar system
  • Installer license or certification
  • Application form

Step 3: Submit Net Metering Application to MEPCO

Once you have collected all of the requirement documents, attach them with the application, and submit your application. You can submit this application physically at the MEPCO office.

Step 4: Technical Evaluation by MEPCO

Through your submitted documents, MEPCO will check your solar system capacity, sanctioned electricity load, and grid compatibility. If everything is correct, MEPCO will issue a demand notice.

Step 5: Pay Demand Notice Fee

Once you have recieved your demand notice from MEPCO, pay this demand notice through any bank including National Bank of Pakistan (NBP), Habib Bank Limited (HBL), United Bank Limited (UBL), Meezan Bank, Allied Bank Limited (ABL), Bank Alfalah etc.

You just take the original demand notice to the bank, pay the fee at the bank counter, and the bank will stamp your demand notice as proof of payment.

Moreover, ou can pay this demand notice at the MEPCO (Multan Electric Power Company) office, or through the online banking apps.

MEPCO Net Metering Cost

Cost Component

Description

Estimated Cost (PKR)

Application Fee

Fee for submitting net metering application

500 – 5,000

Inspection Fee

Fee for system inspection by MEPCO and Electrical Inspector

5,000 – 10,000

Net Meter Cost

Cost of bidirectional (green meter) installation

12,000 – 25,000

Interconnection Charges

Fee for connecting solar system to MEPCO grid

5,000 – 15,000

Solar System Cost (5 kW)

Cost of installing complete solar system

700,000 – 900,000

Solar System Cost (10 kW)

Cost of installing complete solar system

1,300,000 – 1,700,000

Solar System Cost (15 kW)

Cost of installing complete solar system

2,000,000 – 2,500,000

Benefits of Net Metering

Net metering offers several advantages for MEPCO electricity consumers which makes it a practical choice for homeowners and businesses. Following are these benefits:

Energy Independence

Consumers gain more control over their electricity usage. Instead of being entirely dependent on MEPCO’s supply, solar generation allows households and businesses to offset their own demand. This is particularly useful during peak hours or power outages, as it reduces overall reliance on the grid.

Sustainable and Clean Energy Usage

By generating electricity through solar panels, consumers contribute to reducing carbon emissions and help the environment. This has become increasingly important as energy costs rise and awareness about climate change grows.

Net Metering Increases Property Value

Homes and businesses equipped with a certified solar system eligible for net metering are seen as more modern and energy-efficient. This can make properties more attractive to buyers or tenants who are conscious of electricity costs and sustainability.

Common Problems and Solutions for MEPCO Net Metering

Common MEPCO Net Metering ProblemsSolutions
Application delays due to incomplete documentsSubmit all required documents (CNIC, bill, solar specs) and follow up via MEPCO portal
Inspection or meter installation delaysUse certified solar installers and schedule inspections early
Billing mismatches or incorrect creditsCheck meter readings regularly and report discrepancies to MEPCO customer service
Technical rejection of solar systemEnsure on-grid system with NEPRA-approved inverter and proper safety measures
Overcapacity of solar systemDesign system according to sanctioned load and transformer limits

FAQs

It allows MEPCO consumers to generate solar power and export surplus to the grid, reducing monthly bills.

Yes, net metering is legal and regulated by NEPRA, with MEPCO following all official rules.

Consumers with a valid MEPCO connection and an approved on-grid solar system are eligible.

The bi-directional meter records imported and exported units, and you pay only for net consumption.

Common issues include application delays, meter installation backlog, and billing mismatches.

Conclusion

In conclusion, MEPCO net metering is a reliable and legal way for electricity consumers in Pakistan to save on monthly bills, gain energy independence, and contribute to a cleaner environment.

By understanding eligibility requirements, following MEPCO’s 2026 policy guidelines, and installing a compliant solar system, consumers can fully benefit from reduced electricity costs.

Whether you are a homeowner or a business, net metering offers long-term financial savings and added property value which makes it a smart investment in sustainable energy. For smooth approval and maximum benefits, ensure your application is complete, your system meets technical standards, and billing is monitored regularly.